Jurong Poly-Chem Ltd
Clients : Jurong Poly-Chem Ltd
Project Date : 04 Feb 2025
Location : Singapore – 15 Pulau Ayer Merbau
End Date : 12 Aug 2025
Price After : 420,000$
The overhaul of the ethylene cracking unit involved a meticulous calibration of high-pressure steam turbines and the implementation of advanced catalytic recovery systems. Our primary objective was to minimize carbon byproduct during the polymerization phase while maintaining a steady output for downstream plastic manufacturing.
Through the introduction of automated cooling cycles and real-time gas chromatography, the facility achieved a significant reduction in waste heat. This project ensures that the plant adheres to the latest environmental standards for industrial emissions within the Jurong Island hub.